Scarborough wastewater catchment.
The anchor scenario: an EDM-monitored coastal catchment where bathing-water consents, ageing interceptors and CIM evidence collide. Pick any asset to see what we know, what it's telling us, and where it sits in the 20-year forecast.
Discharging to Scarborough Bay (Bathing & shellfish waters). 1 breach · 5 off-track · 4 watch on the asset register today.
Navigable catchment
Real Scarborough basemap with WwTW, CSOs, pumping stations, trunk sewers and CIM stations laid over the top. Filter by asset type, click any feature to open its dossier.
14 of 14 assets shown
Asset dossier · live signals
What we know about the selected asset and what its sensors have said in the last week. This is the per-asset story that drives the risk surface.
Scalby Mills CSO
Storm overflow at the Scalby Mills inlet works on Scalby Beck, immediately upstream of the long sea outfall. Repeated EDM activations during wet weather; screening and storage uplift scoped under AMP8.
- Criticality
- 4 / 5
- Condition grade
- C
- Time-to-non-compliance
- 64 days
- Installed
- 1986
- Permit
- EPR/UB3409CK — 10 spills/yr threshold
- 20-yr forecast spend
- £6.9 M
- Events · 30d
- 7
What the catchment is telling us
8 sensor events shown out of ~8,000/year in this catchment alone — the triage that surfaces "the 6 that matter" lands in Operations.